ACEP At Work – Pilgrim Hot Springs Geothermal Assessment Weekly Project Update

ACEP At Work – Pilgrim Hot Springs Geothermal Assessment Weekly Project Update

-Two inch pipe was deployed to run temperature logs through thick mud. The last section failed and ~950’ of pipe was dropped into the well.

-Fortunately, this occurred while most of the drilling crew took an R&R break for the week

-Two inch pipe was retrieved using creative fishing techniques and a suite of flowing temperature logs were collected

-Terrasat completed geophysical logs of hole

-KNOM reporter visited Pilgrim site

-NEXT WEEK: Well PS-13-1 will be reamed to the full 14” diameter beginning next week

To receive daily updates contact Max Frey (mefrey@alaska.edu).

 

Photo by CPike/ACEP